Almost everything is moved over at this point. Still some little things to sort out, plus some things still to go structurally like more insulation, a ceiling, stairs, external wall panels and the roof. A little shop tour of what is what so far.

Hose reel installed at a reasonable spot. 50', so it will cover anything on both floors and a good ways outside of the shop too.

Temporarily have a drain setup with this hose and a ball valve so I don't have to go upstairs often.

The last bit of wall to be put up is hiding behind my rails. I need to get the long rail, and I have no idea where it will go when I do.

Clockwise around the shop from the entrance. My clamp corner with new rack, fire extinguisher and first aid box, switches for the lights, dust extractor, and air compressor (both upstairs). A Harbor Freight (w/ Powermatic riser) bandsaw and Ridgid drill press serve me well for now.

MFT that will get a syscart at some point for more storage, my CT Midi, and my streaming TV and Chrome OS computer/monitor.

Holtzapffel-style bench made of fir with some horrible storage underneath. That finish cabinet up above I'm not happy with the location.

Left side of my miter station. I think this will get a comprehensive redo at some point. Or maybe pieces of it. Ladder for temporary access upstairs.

Hitachi C12RSH (sprayer of dust), I wouldn't mind putting a Kapex in here for accuracy and dust at some point. There is a Dewalt 735 below that in a flip cart, and a Triton 3HP in the router table.

Delta 36-725 for the saw, good except for dust collection. Old Craftsman 6-1/4" jointer I found on Craigslist, and my OSS and HCM. Harbor Freight DC and HF compressor upstairs.