Yes I did. I had a crew also but I do all of the cutouts and build the face frames. The outside corner cabinets I built completely due to the complexity and they can be a pita!
This kitchen along with 4 bath vanities and several cabinets in the laundry room took a total of about 10 days. Kinda hard to judge because I have to keep our entry level homes flowing (usually 3 sets a week) in between my more frequent larger customs. Attached is a pic of the plan we do the most of. It might not load properly from my tablet but I'll fix from my phone.