Here is the floor plan as it has been for about the last four years:
[attachimg=#1]
That layout was somewhat cramped but OK until 2011 when I added stained glass making to the types of work that I undertake in the shed. Now, that place is away too messy and unorganized. This morning I decided to try a reorg of my major machines to see if that will help. I'm not quite sure where things will end up, but I have made a small start by moving the table saw most of the way to it's new location (which will be about where the planer now sits and perpendicular to that wall). I will need to change some of the ductwork.
Here are a few photos taken about an hour ago.
[attachthumb=#2] [attachthumb=#3] [attachthumb=#4]
If things don't work out, I will replace my jointer and planer with a combo machine. I did attempt to do that last year but, if I need to
do so, I will make a more serious attempt.
[attachimg=#1]
That layout was somewhat cramped but OK until 2011 when I added stained glass making to the types of work that I undertake in the shed. Now, that place is away too messy and unorganized. This morning I decided to try a reorg of my major machines to see if that will help. I'm not quite sure where things will end up, but I have made a small start by moving the table saw most of the way to it's new location (which will be about where the planer now sits and perpendicular to that wall). I will need to change some of the ductwork.
Here are a few photos taken about an hour ago.
[attachthumb=#2] [attachthumb=#3] [attachthumb=#4]
If things don't work out, I will replace my jointer and planer with a combo machine. I did attempt to do that last year but, if I need to
do so, I will make a more serious attempt.