Mahomo59
Member
- Joined
- Aug 31, 2013
- Messages
- 252
Just a shade under 2.7m high ceilings in a basement in Bath. Access was terrible had to fully dismantle apart from the face frames and the doors of course.

Birchply carcass, 20% morrells waterborne lacquer. Maple drawer boxes, customer wanted library strips all the way up for the flexibility, I'm not a fan! Looks daft with the hanging rail...


Wish customers would chose handles prior to the fit! Not a fan of the tape either.

2mm out on my centre shut line a little disappointed. Doors were all made off measurements as never had the room to assemble.

This was a real struggle building these on my own and carrying down the stairs etc and parking was almost a 100m away. Ah well all done and dusted.

Birchply carcass, 20% morrells waterborne lacquer. Maple drawer boxes, customer wanted library strips all the way up for the flexibility, I'm not a fan! Looks daft with the hanging rail...


Wish customers would chose handles prior to the fit! Not a fan of the tape either.

2mm out on my centre shut line a little disappointed. Doors were all made off measurements as never had the room to assemble.

This was a real struggle building these on my own and carrying down the stairs etc and parking was almost a 100m away. Ah well all done and dusted.