Brian Livingstone
Member
- Joined
- Mar 5, 2007
- Messages
- 274
Hello,
I am building a large built in. I am using 3/4 ply on the left, right and top. The depth is say 27 inches. The width is 10 feet. I have two 5 foot pieces of 3/4 ply. Do you think say 4 or 5 6mm dominos will hold the two five foot pieces together while I lift and install on the ceiling ? There are two vents cut and I could put a Bessey clamp to hold the pieces. Also, I will have added 1/2 inch edge banding. I think it should be okay.
There is a 3/8 gap all around and I thought about laminating a 3/8 inch piece of hardwood and using 12 mm doMinos into the what would 1 1/8 inch end.
Once it is in place there won’t be any issue.
Thanks.
I am building a large built in. I am using 3/4 ply on the left, right and top. The depth is say 27 inches. The width is 10 feet. I have two 5 foot pieces of 3/4 ply. Do you think say 4 or 5 6mm dominos will hold the two five foot pieces together while I lift and install on the ceiling ? There are two vents cut and I could put a Bessey clamp to hold the pieces. Also, I will have added 1/2 inch edge banding. I think it should be okay.
There is a 3/8 gap all around and I thought about laminating a 3/8 inch piece of hardwood and using 12 mm doMinos into the what would 1 1/8 inch end.
Once it is in place there won’t be any issue.
Thanks.