EV
Member
- Joined
- Aug 9, 2013
- Messages
- 171
Hello guys,
I am about (in a couple of weeks) to embark on making 4-6 SYS PORTs out of ¾" (or maybe even ⅝" depending on what you lot think be better) ply to house my 35+ various size T-LOCs. These will be on a 100mm (4") castors and will stand around 1500mm or approximately 59" tall. Il'l be using Accuride 350mm (14") full extension drawer runners with hold in feature (rubber bung at the back of the runner).
Now the question I have is: Is there a specific formula to work to in order to be able to house systainers without wasting space regardless of the sustainer size combination? I shall be using "Euro" screws to secure runners in place and this means Ill be using my LR-32 System. At the moment I do not posses a SYS 5 but would like to keep that in mind. Maybe DF700 one day or a TS75 come along to join the party [tongue]
Any suggestions will be appreciated.
Regards
EV
I am about (in a couple of weeks) to embark on making 4-6 SYS PORTs out of ¾" (or maybe even ⅝" depending on what you lot think be better) ply to house my 35+ various size T-LOCs. These will be on a 100mm (4") castors and will stand around 1500mm or approximately 59" tall. Il'l be using Accuride 350mm (14") full extension drawer runners with hold in feature (rubber bung at the back of the runner).
Now the question I have is: Is there a specific formula to work to in order to be able to house systainers without wasting space regardless of the sustainer size combination? I shall be using "Euro" screws to secure runners in place and this means Ill be using my LR-32 System. At the moment I do not posses a SYS 5 but would like to keep that in mind. Maybe DF700 one day or a TS75 come along to join the party [tongue]
Any suggestions will be appreciated.
Regards
EV