Crazyraceguy
Member
- Joined
- Oct 16, 2015
- Messages
- 4,887
This one has been about as strange as any job could be. We started on it after another company failed and dropped out. Our starting point was past the time that the project was supposed to be finished.
I built the big shelving unit, with the arched panels, clear back in February. It sat around in the staging area until just a week or so ago. Now they are in a big hurry, pushing hard to get it done. We finally got the last of the missing dimensions, and they want it asap.
It is still missing the acrylic LED panels that fit into the tops of the shelves, but they can be added later, since the wiring runs are there. It also gets mirrors applied to the back, but those will be applied in the field too.
All I have left is to attach the arched face frame, then remove it again, for shipping.
I built the big shelving unit, with the arched panels, clear back in February. It sat around in the staging area until just a week or so ago. Now they are in a big hurry, pushing hard to get it done. We finally got the last of the missing dimensions, and they want it asap.
It is still missing the acrylic LED panels that fit into the tops of the shelves, but they can be added later, since the wiring runs are there. It also gets mirrors applied to the back, but those will be applied in the field too.
All I have left is to attach the arched face frame, then remove it again, for shipping.