- Joined
- Feb 8, 2007
- Messages
- 1,671
this unit was from a referral in the same neighborhood that I have 14 built ins already out of approx 250 homes.... not a bad ratio
again this was all built on site using the festool system. it took me 6 days and 1 day for my painter who came back yesterday, sunday and did the finish painting. sherwin williams super paint. roller and brush.
I used birch cabinet grade plywood, the usa made and popular for the trim. and I made the doors also.
the 2 chairs are for here kids to sit at and do homework every night and the rest of the built in is for display etc. once I was done she comes back from store with the 2 scones lights for me to put on it.... if I had known beforehand could have did different. oh well it still looks great ..
have 6 more built ins lined up to do... and I sold 2 jobs for built ins just today !
again this was all built on site using the festool system. it took me 6 days and 1 day for my painter who came back yesterday, sunday and did the finish painting. sherwin williams super paint. roller and brush.
I used birch cabinet grade plywood, the usa made and popular for the trim. and I made the doors also.
the 2 chairs are for here kids to sit at and do homework every night and the rest of the built in is for display etc. once I was done she comes back from store with the 2 scones lights for me to put on it.... if I had known beforehand could have did different. oh well it still looks great ..
have 6 more built ins lined up to do... and I sold 2 jobs for built ins just today !