Well, Kapex has been formally introduced to my shop. Kapex caused a major disruption to my shop setup. It caused me to redesign some things, move other things around and chop off the legs of my MFTs. In the end though, I think that I am happy with my new setup.
New Setup:
[attachimg=#]
[attachimg=#]
Getting there:
[attachimg=#]
[attachimg=#]
[attachimg=#]
What it used to be:
[attachimg=#]
Had to create a new mft extension to replace the mft800:
[attachimg=#]
This is phase one of my Kapex work station. I have quite a few upgrades in mind for the work station. The Kapex MFTs will have a removeable bridge to the main MFT station in the last pic above.
New Setup:
[attachimg=#]
[attachimg=#]
Getting there:
[attachimg=#]
[attachimg=#]
[attachimg=#]
What it used to be:
[attachimg=#]
Had to create a new mft extension to replace the mft800:
[attachimg=#]
This is phase one of my Kapex work station. I have quite a few upgrades in mind for the work station. The Kapex MFTs will have a removeable bridge to the main MFT station in the last pic above.