What does the engineer that calculated it recommend? That is who I would recommend asking. What is the point of the second non load bearing beam for? Is it structural or cosmetic?
Still I gotta admit I am lost on your drawings, maybe because I can't see the bigger picture. Does "floorboards" mean joists? Or stair treads? Are the beams not sitting on top of each other, but with the "floorboards" and a spacer in between?
Either way they should have some strapping going from one to the other. The engineer should have put it into plans.
Still I gotta admit I am lost on your drawings, maybe because I can't see the bigger picture. Does "floorboards" mean joists? Or stair treads? Are the beams not sitting on top of each other, but with the "floorboards" and a spacer in between?
Either way they should have some strapping going from one to the other. The engineer should have put it into plans.