50 sheets a night.

Joined
Apr 14, 2008
Messages
4,205
Big push, my buddy fabbed the ramps and turn tables.
I had to cut up at least 50 sheets a night to put 2 layers of 3/4" ply on it.
 
WarnerConstCo. said:
Big push, my buddy fabbed the ramps and turn tables.
I had to cut up at least 50 sheets a night to put 2 layers of 3/4" ply on it.
Glad to see some of the luster restored as we drive by the auction park these days.  Hopefully Labor Day this year will bring some of the action back for the local economy.  Tom
 
I thought the title was in reference to a bad curry night  [eek] [oops]

I take it this is for a car auction, what with the strength of construction and the turntables, interesting job!

Rob.
 
Nice set up. I guess setting up for an auction is like setting up for a tradeshow. Walk in and FLY!

Now my question for you is what do you use for "wings" or outfeeds for you Kapex? I've brewed a few ideas, I was going to use my sawhelpers but after watching my crew cut on the Makita "stuff" I think the Makita will keep the sawhelpers.

No good tool is Rouge on a jobsite if it works well and those blue one's are a long time trim/cabinet standard. (I do know you were joking).
 
It was a lot of fun and also paid very well. They plan on working on that place for the next 4-5 years.

I usually use my mft/3 and my ct-22 with a sys2 and sys3 for support on the other side.

I should be getting the kapex extensions this week in the mail.
 
I thought this thread title was referring to fifty sheets....of SANDPAPER in a night.

Now, THAT would have made you a busy man!

Still, that's a lot of wood.
 
Back
Top