During this final felt pad, I throw some cotton jersey gloves on over my nitrile gloves used when applying wet finish. Trying to touch the the finish as little as possible. I hang the piece form the ceiling to dry. As I said I wait at least 12 hours to recoat.
Lightly sanding with P1000 granat further smooths the finish and points out any problem areas. I usually stop at 2 coats but have been know to use 3.
I'm of the opinion that the OSMO takes 2 weeks to fully cure so I let i hang about that long until I assemble. I usually use the felt pad again after this time frame.
These are the pads I use:
https://www.amazon.com/gp/product/B01H1ZX0XA/ref=ppx_yo_dt_b_search_asin_title?ie=UTF8&psc=1
I may have gotten a bad batch but I really hate the Vlies pads. I find them useless fro this application. They generally fall apart on me almost immediately.
Ron