JCLP
Member
- Joined
- Oct 27, 2013
- Messages
- 955
Hi Foggers,
After spraying one side of a doors/panel and a letting it dry for several days, I then flip it over to do the other side and lay it back down on the drying rack. I found that after a fews of drying, the side touching the rack, which has had several days to dry, gets a mark from the rack. I've waited as long as a week before flipping a door to paint the front side. Would anyone have any suggestions.
Thanks,
JC
After spraying one side of a doors/panel and a letting it dry for several days, I then flip it over to do the other side and lay it back down on the drying rack. I found that after a fews of drying, the side touching the rack, which has had several days to dry, gets a mark from the rack. I've waited as long as a week before flipping a door to paint the front side. Would anyone have any suggestions.
Thanks,
JC