Nice! I ordered a set of TrackTubes last week and they are getting delivered today. I have the Veritas setup as well, and was planning on doing the similar setup for ripping plywood.DynaGlide said:Here's what worked for me when doing my last big plywood project:
Lee Valley supports mounted on tracktubes:
![]()
Delivery guy and I carry the sheets in and drop them on:
![]()
I rip them on the cutting station and crosscut on the MFT's:
![]()
![]()
Only thing I'd do different next time is put some wood sticks between each plywood sheet so I can cut them without moving the stack off. The other pain is the sheet I needed to cut was always in the middle or on the bottom of the stack. So I'd slide them over and off to the MFT's to re-arrange them.
Sent from my iPhone using Tapatalk