Hello all,
I have a question regarding the Festool VAC SYS system.
I’m about to pull the trigger on it, but I would like to know if I should just get the PMP pump and the SE1 element or get the complete set which includes the SE2.
What type of work makes getting the SE2 element important?
At what length does melamine/wood start to curve when it's only clamped with the SE1?
Can you break down a 4x8 plywood sheet if you ever wanted to do it using only the SE1? (Obviously, it has to be carefully done using a track and making sure you won't cut over the SE1, ouff just thinking about this is painful)
Keep in mind that I have a couple of closet projects to complete, so basically I will be working with panel sizes of 7’ x 1.5’ panels and the LR32 system. I also have an upcoming large computer desk project.
Your honest opinion is greatly appreciated, thanks
I have a question regarding the Festool VAC SYS system.
I’m about to pull the trigger on it, but I would like to know if I should just get the PMP pump and the SE1 element or get the complete set which includes the SE2.
What type of work makes getting the SE2 element important?
At what length does melamine/wood start to curve when it's only clamped with the SE1?
Can you break down a 4x8 plywood sheet if you ever wanted to do it using only the SE1? (Obviously, it has to be carefully done using a track and making sure you won't cut over the SE1, ouff just thinking about this is painful)
Keep in mind that I have a couple of closet projects to complete, so basically I will be working with panel sizes of 7’ x 1.5’ panels and the LR32 system. I also have an upcoming large computer desk project.
Your honest opinion is greatly appreciated, thanks