Hi everyone,
I've been building a makeup station from my wife and it is my first ever cabinet project.
The station consist of a cabinet both sides with a middle drawer.
Once I'm done, I will get a slab of quartz installed.
When I fitted the cabinets in place, I found that the tile floor is not leveled, there is a slope with the back higher by about half an inch. So there is a big gap on the front and on the sides.
What would be my options at this stage to make the base of the cabinet flush with the tiles or at the very least reduce the gap as I plan to apply some caulk along the gap.
Thanks!
I've been building a makeup station from my wife and it is my first ever cabinet project.
The station consist of a cabinet both sides with a middle drawer.
Once I'm done, I will get a slab of quartz installed.
When I fitted the cabinets in place, I found that the tile floor is not leveled, there is a slope with the back higher by about half an inch. So there is a big gap on the front and on the sides.
What would be my options at this stage to make the base of the cabinet flush with the tiles or at the very least reduce the gap as I plan to apply some caulk along the gap.
Thanks!