Hi everyone,
I decided enough was enough, i'm ready to try out Festool. Got all excited about running down to Woodcraft to pick up a DF500. They were out of stock. Another local lumber store was also out of stock. A bit of internet research revealed that pretty much everyone is out of stock with estimates ranging from Late February to mid May for stock to return.
I ALMOST came home with the DF700 instead, but thought twice and decided to do a bit of research. Most of my work is household furniture: coffee tables, side tables, cabinetry, etc. I work mostly solid wood but do use the occasional 3/4 ply. For this work, i figured the DF500 was the sweet spot that got all of the required sizes. I do some dining tables as well which would be a good match for the DF700, but the DF500 i felt could handle it as well.
I am aware of the accessories that Seneca sells for the DF700, but fear these may make the machine more cumbersome - maybe this is just ignorance.
So to the Hive mind - do i wait the 6-16 weeks backorder on a DF500, or jump on the DF700 and not look back. As always, budget is a consideration, but i can justify either one (though likely not both).
Alex
I decided enough was enough, i'm ready to try out Festool. Got all excited about running down to Woodcraft to pick up a DF500. They were out of stock. Another local lumber store was also out of stock. A bit of internet research revealed that pretty much everyone is out of stock with estimates ranging from Late February to mid May for stock to return.
I ALMOST came home with the DF700 instead, but thought twice and decided to do a bit of research. Most of my work is household furniture: coffee tables, side tables, cabinetry, etc. I work mostly solid wood but do use the occasional 3/4 ply. For this work, i figured the DF500 was the sweet spot that got all of the required sizes. I do some dining tables as well which would be a good match for the DF700, but the DF500 i felt could handle it as well.
I am aware of the accessories that Seneca sells for the DF700, but fear these may make the machine more cumbersome - maybe this is just ignorance.
So to the Hive mind - do i wait the 6-16 weeks backorder on a DF500, or jump on the DF700 and not look back. As always, budget is a consideration, but i can justify either one (though likely not both).
Alex