Hi!
I have been asked to do a walk way over a pond.
I have done a bit of work for this job before over the years.
Some how I have been roped in to actually doing the entire pond.
I don't know how its happened and I didn't know for sure until the client said while you are digging round the pond area and doing the pond liner can you do some digging here while you have the digger. Thats when the ball dropped [scared]
I am no pond expert so I have come here to ask for some advice what are the best pond liners and under lays etc
How best to prep the area etc. The client wants no banking he wants it like a swamp, so the water runs into the grass.
They wanted me to concrete the pond but I didn't like that idea AT ALL! It would cost THOUSANDS just on concrete alone. Plus I would be worried about it cracking the pond is 600 sq meters and is shaped like a peanut
Cheers
JMB
I have been asked to do a walk way over a pond.
I have done a bit of work for this job before over the years.
Some how I have been roped in to actually doing the entire pond.
I don't know how its happened and I didn't know for sure until the client said while you are digging round the pond area and doing the pond liner can you do some digging here while you have the digger. Thats when the ball dropped [scared]
I am no pond expert so I have come here to ask for some advice what are the best pond liners and under lays etc
How best to prep the area etc. The client wants no banking he wants it like a swamp, so the water runs into the grass.
They wanted me to concrete the pond but I didn't like that idea AT ALL! It would cost THOUSANDS just on concrete alone. Plus I would be worried about it cracking the pond is 600 sq meters and is shaped like a peanut
Cheers