six-point socket's tidbits of Home Improvement, small projects and other stuff.

  • Thread starter Thread starter six-point socket
  • Start date Start date
Status
Not open for further replies.
Thanks! :)

--

Festool delivered spare part 26 in less than 24h... AMAZING!

[attachimg=1]

Installed. DX 93 E finished.

[attachimg=2]

Kind regards,
Oliver
 

Attachments

  • IMG_9763.jpg
    IMG_9763.jpg
    67.5 KB · Views: 1,783
  • IMG_9771.jpg
    IMG_9771.jpg
    119.5 KB · Views: 1,782
Hey Oliver...Love the water tap, I may need to borrow that idea from you. [cool]

Also, real nice job on the restoration of the DX 93, she looked a bit rough in the original photos.
 
[member=167]neilc[/member] & [member=44099]Cheese[/member]  Thank you very much! :)

For the record I have to admit that the water tap itself was not my idea/work, I saw it and bought it from a German company: "bellissa Haas GmbH" ->http://www.bellissa.de/index.html

If you make one Cheese, I definitely would love to see it :)

Kind regards,
Oliver
 
Hey Oliver,
I'll definitely make one because I've been looking at the big box stores and really don't like what they have to offer. Because the location of the installed faucet is not protected, the faucet has to be very robust and must withstand the daily abuse of children, dogs and anyone else that happens to come by.

Interestingly enough, a few years ago I built a concrete bench from some leftover concrete blocks and a cement slab so that the passersby could sit down and relax and just enjoy the view or have a picnic. However, one day as I drove down the alley, I noticed that the bench was being dismantled and the local 10-12 year old delinquents were trying to roll the pieces down the embankment and onto the railroad tracks.  [jawdrop]
Like I said...robust it needs to be.
 
  Hey Oliver, Great bit of bargain hunting going on there.
I'm also very impressed with the 24hr parts delivery from Festool for 3.5 euro. I tend to forget how everything is so more automated in Europe. Sevice like that unfortunately down here just doesn't exist, we have to be very patient people, last parts I ordered up took over three weeks to turn up, and I had to drive to collect them. We have to plan ahead and usually have a few different projects on the go.
 
Cheese said:
...
Interestingly enough, a few years ago I built a concrete bench from some leftover concrete blocks and a cement slab so that the passersby could sit down and relax and just enjoy the view or have a picnic. However, one day as I drove down the alley, I noticed that the bench was being dismantled and the local 10-12 year old delinquents were trying to roll the pieces down the embankment and onto the railroad tracks.  [jawdrop]
Like I said...robust it needs to be.

Do they sell hungry pitbulls in the cities?
 
Holmz said:
Do they sell hungry pitbulls in the cities?

That's a thought... [smile]

So...after I retrieved all of the concrete blocks from the RR tracks (they couldn't push the bench top down the hill because it weighs 120-130#), I decided to pay their parents a visit.
I politely described the situation but was told, that their children would n e v e r do anything like that...and besides the children didn't have enough time to do it because "they just returned from Bible Camp a few hours ago."  [huh] [huh]
 
Cheese said:
Holmz said:
Do they sell hungry pitbulls in the cities?

That's a thought... [smile]

So...after I retrieved all of the concrete blocks from the RR tracks (they couldn't push the bench top down the hill because it weighs 120-130#), I decided to pay their parents a visit.
I politely described the situation but was told, that their children would n e v e r do anything like that...and besides the children didn't have enough time to do it because "they just returned from Bible Camp a few hours ago."  [huh] [huh]

Video on your phone .. forget the parents, just engage the police. A stunt the derails a train could kill a lot of people.

Delinquency like that shows there's something really sick and evil in those children. What's next? [eek]

Parents never see the bad in their children until it's too late .. unfortunately that's a fact.

[member=44099]Cheese[/member]
 
Hi!

[member=44099]Cheese[/member] It's always sad when one builds something for the general public of the town, and then some crazies (minors or not...) try to pull it apart / destroy it. And even worse that they would really try to put concrete blocks on a RR track...

When I read you went to their parents I already thought they would deny their kids did it... Even bringing out the bible camp...  [eek]  [scared]  [big grin]

[member=42735]DB10[/member]

Thank you very much and I'm sorry to hear it's such a trouble getting Festool spare parts in Australia. If there is ever anything you need to have in really short time, let me know - I'm an UPS and DHL customer myself, so when Festool delivers within 24 hrs to me, I can have it in another 24 to 48 hrs at your door/site if necessary, of course shipping will be a little more on the $$$ side then - but sometimes downtime is even more expensive. Just let me know if the need should ever arise.

Kind regards,
Oliver
 
[member=57586]six-point socket[/member] Thanks Oliver for the kind offer it is much appreciated.
 
Cheese said:
...

That's a thought... [smile]

So...after I retrieved all of the concrete blocks from the RR tracks (they couldn't push the bench top down the hill because it weighs 120-130#), I decided to pay their parents a visit.
I politely described the situation but was told, that their children would n e v e r do anything like that...and besides the children didn't have enough time to do it because "they just returned from Bible Camp a few hours ago."  [huh] [huh]

The Lord works in strange ways.

These large wire jobs with the rocks also make attractive walls.
I am not sure how they would work where there is snow and frost.
 
"Home improvement" from the spectator's side is really, really hard for me, it makes me wanna grab a tool and do something. Maybe someone finds this type of work interesting - so I thought I'd cover it here in my thread.

Preface: Our city's mayor along with other elected individuals from the city council and the heads of our electricity/gas supplier decided they would step up their game and also offer "multimedia"-services (Internet, Phone, TV ...) And, lets say because our Mayor made some moves that could be discussed most diversely depending on "who" you are - the city has a lot of money right now.

In fact so much, that everyone who signed up is getting a fiber optic cable right into his basement and a handover point installed for free. You can then decide if at some point you want to switch over to their services or stay with what you have. Anyway - this is a no brainer as it adds value to the house/property - so I said they could do it. Additionally, for a grand they connect you to the gas line if you want - you have then 10 years to replace your current oil-fired heating with a gas heating. Also a no brainer - regularly it costs 2.5 grands and it's not going to get cheaper over the years - so I said again: Do your thing... ;)

--

Today they started by placing plastic tubes from the sidewalk (public property) to/into my property for the optical fiber cable.

I came from the bakery this morning to find this:

26045881pa.jpg


26045883iz.jpg


Then they rolled in a little compressor
26045884tu.jpg


26045885bf.jpg


And some strange looking tubes and tool
26045886qq.jpg


26045888fc.jpg


I guess it's a pretty robust tool
26045892kg.jpg


26045899vg.jpg


Here's a video how it works, please excuse the babbling in the background, not me....https://sendvid.com/n2oyprha

Then the first outer tube is inserted
26045901kv.jpg


26045903rz.jpg


Followed by a second tube
26045906dg.jpg


A little loop is placed in the hole and everything back filled up and closed
26045915qp.jpg


This is now rolled, waiting for the other team.
26045917mh.jpg


--

It's 5 AM here right now, and I guess at 8 AM civil engineers will arrive and dig another, much larger hole for the gas tubes and connection. I don't know, but I hope they will leave everything that was done yesterday intact - otherwise it would be a profound waste of time... but I have no real say in this. lol. I'm just the spectator...

If there's some interested I will add more of this to this thread.

Kind regards,
Oliver
 
Are the dark pavers all just the public footpath? Have they started to dig into your property yet?

Kev.
 
Hi,

Yes, everything dark = public. Grass = my property. So they dug one hole where the tubing comes out on my property already.

But wait for tonight, this is becoming pure slapstic - they are busy now, I have to watch closely, so I'm off again.

Kind regards,
Oliver
 
Hi!

I'm at a loss for words, at least a little.

Yesterday two guys came and put the fiber optic cable in the ground with their special tool. You can find the pictures and video posted above.

Today two civil engineers came to lay the gas tubing in the ground.

Please keep in mind these sub-contractors work all for the same client who schedules everything.

Who finds the "mistake"? Still lolling about this - basically unbelievable. 2 people have wasted a complete day yesterday.

26056291ms.jpg


26056290bw.jpg


26056288oy.jpg


Kind regards,
Oliver
 
So let me guess..

Yesterday the guys with the special tool showed up and managed to get the line installed without having to dig a trench.  The gas line guys came in today and had to dig a trench in the same spot as the fiber line. So the fiber line was taken out, the gas line put in and then the fiber line was placed back into the trench.... 

Timing is everything... And unfortunately I also see integration of services not always work out.  Something always gets done at least twice.. [blink]

Been enjoying your posts.
 
In our local council when work on a paved footpath happens, the pavers are taken up .. they vanish .. the work is done, then covered in black tar. Many months later someone will come along, dig up the black tar and replace it with new pavers.
 
While you're right in thinking it's a complete waste, sometimes scheduling in an additional dependency for the fiber guys to drop the cable when the gas line is being run (for those residents that opted in) can be problematic. But if most residents opted in, yes, you would think there is an opportunity to save money...unless the mayor paid way too much and the contractor doesn't really care because they are getting well paid.

Who knows what the real story is!  But it's good for a laugh as long as my taxes aren't paying for it (then I cry).  :)
 
Status
Not open for further replies.
Back
Top