rnt80
Member
- Joined
- Mar 30, 2008
- Messages
- 953
The vast majority of my time is spent in my shop with only a small percentage, maybe ten percent, in the field doing the final installation. While I've done some trim carpentry in the past I don't feel it has been enough to confidently price out the current job I've been approached on. There are two archways that need to trimmed out, approximately 250' of crown, and 80' of wainscoting. For those of you guys that do trim work for a living do you charge by the linear foot or time plus materials? The wainscoting is basic frame an panel, shaker style with no applied moulding or profiled edge.