- Joined
- Jan 22, 2007
- Messages
- 8,426
Jeff R said:You let it slip that Festool is trying to go through the CPSC expedite process, and you don't know if that's going to fly or not. That actually does tell me something, though I'm not sure exactly what.![]()
Well, that's not exactly what I said. We have submitted this through a fast track option with the CPSC and every indication is that it will be accepted for fast track processing.
When I said my hope is that it will be expedited by the CPSC, I meant that I hope it gets through their system quickly.