Crazyraceguy
Member
- Joined
- Oct 16, 2015
- Messages
- 4,901
One of the interruptions to the last job I was working was this monster. There will be base cabinets below in the final install, and this goes on top. It is just over 60" above the counter-top line, with the center opening at nearly 102" wide. That center section splits in the middle, a few 6mm Dominos and Lamello Clamex hold them at the back and top. All of the faceframe pieces are loose, to be applied in the field, all with 6mm Dominos too.
I did some glass panel cabinet doors for this job, earlier in the week, but I think those have been delivered already?
I did some glass panel cabinet doors for this job, earlier in the week, but I think those have been delivered already?