ryanjg117
Member
- Joined
- May 18, 2015
- Messages
- 329
Drywall is up and I'm calling this project "done" for now. Not striving for perfection here as this basement will see a remodel within the next two years. Eventually I'll:
* Replace the hideous commercial ceiling tiles and fluorescent lighting by taking the T&G siding from the walls, refinishing them much lighter, and putting on the ceiling with recessed can lights
* Removing drywall and adding 2" of depth to the studs so I can fit thicker insulation.
* Making some electrical improvements while the walls are open.
* Installing a small heat pump for just this basement space
* Vinyl plank floors with a good vape barrier on the slab
* Self closing fire door for the garage
* Etc
Off to load up my Bagster!
* Replace the hideous commercial ceiling tiles and fluorescent lighting by taking the T&G siding from the walls, refinishing them much lighter, and putting on the ceiling with recessed can lights
* Removing drywall and adding 2" of depth to the studs so I can fit thicker insulation.
* Making some electrical improvements while the walls are open.
* Installing a small heat pump for just this basement space
* Vinyl plank floors with a good vape barrier on the slab
* Self closing fire door for the garage
* Etc
Off to load up my Bagster!