I started this well before xmas last year and it got left on the shelf until March. Was suppose to be part of xmas gift for my daughter. [embarassed]
I finished it in March while doing the loft wardrobe,I used the same stain. [wink] It's not completely finished the end infill panels are to be painted.
Redwood pine, Period NGR stain, Supreme wax finish. Domino joints, some draw bored and bed bolts.
Posts top bit was shortened after dry fit. The spindles mortices where made with domino 10mm on widest wiggle.
I finished it in March while doing the loft wardrobe,I used the same stain. [wink] It's not completely finished the end infill panels are to be painted.
Redwood pine, Period NGR stain, Supreme wax finish. Domino joints, some draw bored and bed bolts.


Posts top bit was shortened after dry fit. The spindles mortices where made with domino 10mm on widest wiggle.