galwaydude18 said:
Did you make the gutters yet?
Made them ages ago dude and fitted them but not done the down spout. Slight problem as we believe the building has risen up on one side which annoyingly is where the down spout cut out is. So the gutter is holding a lot of water even though we haven't sealed the screws yet.
Believe this has happend because he has removed Alot of trees and branches on the back side and the clay has expanded and pushed the building up. So we need another down spout on the other side to allow it to drain! Typical!!
Jmb