February of this year (2015, about 7 months ago at this time) my wife and I started in on remodeling both the master and the kids bathrooms at the same time. Just today I finally finished the kids vanity.
Fave frames are oak with black stain and black tinted topcoat. Quartz top.
The floors have this tile on it with dark grey grout. The bathroom was designed to be black and white.
Repurposed an 80-inch by 40-inch wall mirror by cutting it in thirds. Here's the final sized prices.
Machines up and assembled some oak for the frames
Stained and cleared them and installed the mirrors.
Mounted them above the vanity
And fully assembled with drawers, fronts and doors.
Here you can barely make out the grain behind the stain and topcoat.
Shifting now to the built in. I'll post up more once I get it finished.
Fave frames are oak with black stain and black tinted topcoat. Quartz top.

The floors have this tile on it with dark grey grout. The bathroom was designed to be black and white.

Repurposed an 80-inch by 40-inch wall mirror by cutting it in thirds. Here's the final sized prices.

Machines up and assembled some oak for the frames


Stained and cleared them and installed the mirrors.

Mounted them above the vanity

And fully assembled with drawers, fronts and doors.

Here you can barely make out the grain behind the stain and topcoat.

Shifting now to the built in. I'll post up more once I get it finished.