sancho57
Member
- Joined
- Jan 13, 2011
- Messages
- 7,089
So as a lot of you know we moved to Az and bought a new home. So the wife wanted some cabinets for the laundry room. It took a while to build and finish as I was working in my uninsulated uncooled garage. We had a record heat this summer with over 50 straight days of temps above 110. I managed to spray them in the morning with the temps about 90' or more. Came out ok considering the temps.
Anyway here they are before and after. Oh yes I installed the trim moulding the next day. The large broom cabinet is one piece about 6' high
Anyway here they are before and after. Oh yes I installed the trim moulding the next day. The large broom cabinet is one piece about 6' high