I am in the process of installing a 125A sub panel in my garage to run a jointer/TS/planer and charge an EV and was hoping some experts could help me iron out the nuts and bolts!
The distance from the main panel (200A) to the garage is roughly 70 feet with half of it in a basement, part of it in a crawl space, and the rest in in a subterranean conduit to the garage.
My plan is to use (per NEC):
2/0 AWG XHHW for the 2 hot lines and neutral and then 6 AWG. The subpanel itself will be earth grounded via rods.
The car and tools are obviously power hungry, but my house loads are not high (natural gas furnace/dryer/stove/hot water heater). Besides, I would never be charging the car, and jointing/ripping/planing at the same time!
Anyone have any recommendations/advice to offer? Thanks!
The distance from the main panel (200A) to the garage is roughly 70 feet with half of it in a basement, part of it in a crawl space, and the rest in in a subterranean conduit to the garage.
My plan is to use (per NEC):
2/0 AWG XHHW for the 2 hot lines and neutral and then 6 AWG. The subpanel itself will be earth grounded via rods.
The car and tools are obviously power hungry, but my house loads are not high (natural gas furnace/dryer/stove/hot water heater). Besides, I would never be charging the car, and jointing/ripping/planing at the same time!
Anyone have any recommendations/advice to offer? Thanks!