I apologize if this is a repeat question, but I just had to get this on here before for sanity sake
What is the best purchase after buying the ts55? The 106" Rail, The MFT, or the 95" holey rail?
The 106 rail will give me enough length for a sheet of plywood, but if I decided to get the lr32 system I would have to buy another rail, very expensive
Which leads me to my next option the 95" lr32. But why in the world would this just not be over 8' long? The means I would be short on sheet goods and have to connect another rail, which defeats the purpose of buying the huge rails
And the MFT would give me a great work surface for crosscuts, and in the future I cant wait to build a mobile cabinet for one them, but for now the 32" rail it comes with would leave me short on sheet goods if I combined it with the 55"
I hope you can understand my situation here, please and thank you for any advice given
Jared
What is the best purchase after buying the ts55? The 106" Rail, The MFT, or the 95" holey rail?
The 106 rail will give me enough length for a sheet of plywood, but if I decided to get the lr32 system I would have to buy another rail, very expensive
Which leads me to my next option the 95" lr32. But why in the world would this just not be over 8' long? The means I would be short on sheet goods and have to connect another rail, which defeats the purpose of buying the huge rails
And the MFT would give me a great work surface for crosscuts, and in the future I cant wait to build a mobile cabinet for one them, but for now the 32" rail it comes with would leave me short on sheet goods if I combined it with the 55"
I hope you can understand my situation here, please and thank you for any advice given
Jared