woodbutcherbower
Member
Greetings from the icy UK.
Not the best time of year to be rebuilding a workshop, but financially and logistically the best time for me to be doing it. There’s currently no running water, power or heating. Faced with a time-critical customer build, I now have the dilemma of an extensive glue and clamp-up at zero degrees C - the usual external Titebond III isn’t an option because of chalking, so it’s out with the PU which I don’t especially enjoy using.
What’s the forum’s go-to method/solvent for cleaning up PU squeeze-out and foam? The application is a huge set of driveway gates in kiln-dried oak. Mortise & tenon main joints, with a V-grooved infill of 4 x 1’s machined into T&G. Lots of nooks & crannies …..
Thanks in advance.
Not the best time of year to be rebuilding a workshop, but financially and logistically the best time for me to be doing it. There’s currently no running water, power or heating. Faced with a time-critical customer build, I now have the dilemma of an extensive glue and clamp-up at zero degrees C - the usual external Titebond III isn’t an option because of chalking, so it’s out with the PU which I don’t especially enjoy using.
What’s the forum’s go-to method/solvent for cleaning up PU squeeze-out and foam? The application is a huge set of driveway gates in kiln-dried oak. Mortise & tenon main joints, with a V-grooved infill of 4 x 1’s machined into T&G. Lots of nooks & crannies …..
Thanks in advance.