Was called back to the installation tof frame out and finish transition to courtroom. I was hoping to scribe a piece of veneered ply around the port a potty entrance, and was wondering best practices for the job. I've scribed moulding and baseboard, and maybe a few feet long section of rock, but never a full 7 ft run like this. Was figuring just a compass and a test board for fit, and then once a get it right transcribe the cut out to the veneer piece I'll be using. Ill do it in three sections most likely, the two sides and then the top. The opening is 54 inches wide, so too long for a single 4x8 sheet. Any suggestions?
[attachthumb=1]
I And here's a closer look after the framing I put in[attachthumb=2]
[attachthumb=3]
[attachthumb=4]
[attachthumb=1]
I And here's a closer look after the framing I put in[attachthumb=2]
[attachthumb=3]
[attachthumb=4]