Grasshopper
Member
- Joined
- Oct 6, 2014
- Messages
- 595
All, I realize there are many posts on the subject of squaring your MFT/3 Fence.
Here is what I came up with that takes no time at all.
Seems to do a good job for me.
I just line up 4 Qwas dogs, layout my Woodpecker 1281 square to the fence and guide rail, and place the Guide Rail connector (482107) between the square and the Qwas. From there, I snug up the fence and rail against my square (pressing into the Dogs), and I am all set. The gap filled by the Woodpecker square and guide rail connector turned out to be perfect.
The whole process takes around 30 seconds.
[attachimg=1]
Thoughts/Feedback?
Here is what I came up with that takes no time at all.
Seems to do a good job for me.
I just line up 4 Qwas dogs, layout my Woodpecker 1281 square to the fence and guide rail, and place the Guide Rail connector (482107) between the square and the Qwas. From there, I snug up the fence and rail against my square (pressing into the Dogs), and I am all set. The gap filled by the Woodpecker square and guide rail connector turned out to be perfect.
The whole process takes around 30 seconds.
[attachimg=1]
Thoughts/Feedback?