Hi!
Today's progress. Applying cement lime plaster/cement calcareous plaster. Then the necessary plywood was dropped off. 40mm thickness. 2500x1250 mm (one sheet) had to be bought. Quality: BB/CP, we had it cut pre delivery. Then the cement lime plaster had to be "rubbed" - Can someone tell me the correct english term for when you use a wet sponge to smoothen the plaster surface.
A cut out was made so the drain pipe would fit through and the drain pipe was installed. Brackets were installed.
The plywood board was mounted to the "legs" and additionally secured to the wall via the brackets I mentioned above. One component polyurethane adhesive (Würth Bond & Seal via 300ml cartrdige) screws & wall plugs were used for this.
PCI Wadian was used as primer on the plywood. After a short drying period, tiling started. To make tiling the front-end/ face side as painless as possible, some scraps were screwed to the board from the underside. So the tiles can rest on spacers put in between.
The floor was then "plastered" with PCI Repafix.
Applying cement lime plaster.
"Wateredge"
40mm plywood "scraps" (BB side)
CP side
Stamp
Installing drain pipe, brackets and rubbing the cement lime plaster.
"Wateredge" cement lime plaster rubbed.
Plywood board installed.
Primer applied to plywood board.
Tiling, upper side.
Scraps installed to help with tiling face side.
Tiles on face side.
"Plastering" the floor with PCI Repafix.
End of day two.
Kind regards,
Oliver