GPowers
Member
- Joined
- Mar 1, 2010
- Messages
- 2,326
Here is a picture for the calendar.
I talked to a guy that was using his MFT/3 at the top of a lift. He was installing some kind of wood ceiling up so 20 to 25 feet in the air. Originally he was going up to measure and fit and then coming down to cut. The MFT/3 up in the list saved a tremendous amount of time on the job. His boss was very happy. Oh the MFT/3 and the idea to use it was the employees not the Boss's.
I talked to a guy that was using his MFT/3 at the top of a lift. He was installing some kind of wood ceiling up so 20 to 25 feet in the air. Originally he was going up to measure and fit and then coming down to cut. The MFT/3 up in the list saved a tremendous amount of time on the job. His boss was very happy. Oh the MFT/3 and the idea to use it was the employees not the Boss's.