Z ZeesWoodShop Member Joined Aug 1, 2011 Messages 103 Feb 14, 2013 #41 Think it was about 3 weeks before installing. The moisture content was really low to begin with was fresh out of the kiln
Think it was about 3 weeks before installing. The moisture content was really low to begin with was fresh out of the kiln