kevinvandeusen
Member
- Joined
- May 20, 2012
- Messages
- 24
The extensions are rock solid. The short one clips right on, the long one has a nicely designed leg, it does not rack at all. Very nice engineering.
kevinvandeusen said:The extensions are rock solid. The short one clips right on, the long one has a nicely designed leg, it does not rack at all. Very nice engineering.
Wonderwino said:My rep said the ship is due in port on Sunday, so the machines should be delivered within 10 days of arrival. [cool]
TomGadwa1 said:Excuse me but what happened to the month of May? Or am I missing something?
Tim Raleigh said:TomGadwa1 said:....what happened to the month of May?
That's Felder time!
rnt80 said:Tim Raleigh said:TomGadwa1 said:....what happened to the month of May?
That's Felder time!
Hardy har har......not funny. I sold my jointer and planer trying to time it right so that I wouldn't have much of a gap between getting rid of my old machines and taking delivery of the new one. This extra month has completely thrown that out the window.