I have been working on this place for going on 4 years, this summer.

It has had a new roof, new windows, new doors, new insulation, new hardie plank, new soffet and fascia, new seamless gutters, Tigerwood deck, new stamped front porch, new electrical service, refinished oak floors, new tile entry way, and probably some more stuff too. 

I am making all new door jambs, hanging 6 panel oak doors, new base board and shoe, new window and door casings, crown moulding and I am opening a wall up slightly and making a new cased opening between the dining room and living room, some floor patching (moving a heat duct) and a cherry inlay/transition.

No inside pictures yet.

I am trimming out a knee wall and some jazz like that.

I milled up some lumber after dinner and put these together.  I started with RS Red Oak. 

004_zps9cfb706e.jpg


005_zpse1d73379.jpg


002_zps959c9bb1.jpg


007_zps6115c8b6.jpg


008_zpsa2b89d30.jpg


009_zps18c70ea2.jpg


011_zpsbaa7bd99.jpg


012_zps6cf1c835.jpg


014_zps75321a88.jpg


The last three are just to show that the DC with the OF1400 is pretty good.
 
I was finally able to get back to working on this, after lunch today.

I had to move two more outlets at the place, plus the furnace was put on it's own circuit. 

Tomorrow I can go get the archway installed, finish installing the bases and caps and get back to running some trim.

002_zps5ffa7810.jpg


003_zps2f3cae8b.jpg


004_zps9512489a.jpg


005_zps3cd9d86b.jpg


008_zps16a5b116.jpg


010_zps3e246890.jpg


011_zps5aa9cdb3.jpg


014_zpsd06ac94f.jpg


015_zpsb5d95f2d.jpg


I am going to have to wet the face of the ply wood some, before I bend it and leave it in place.
 
Glad to see that you are continuing on this house.

Looking forward to more progress updates!  Love the kerfing and bend.

Peter
 
Warner:
Looks good. Some nice looking Oak there. It'll be nice to see it up in the house.
Tim
 
Damn this house. I am up to about 25 hours in just moving and repairing stuff.

Had to move two light switches (led to finding taped together wire splices in attic, which led to a new lighting circuit being run), two outlets had to be moved (which led to discovering the furnace was tied into all the recepts in the house, which led to a new circuit for the furnace), removed some oak flooring to move a heat duct from the middle of a doorway (which led to having to re-route some plumbing lines).

I think I have almost 25 extra billable hours, just so I can get these 3 rooms finished.

Oh well, back at it tomorrow.
 
Took the family on a little drive tonight (3 minutes tops) to take some pictures and do a little visiting.

Walk in the front door:

1001_zpse160bb46.jpg


1000_zps18b15ed7.jpg


Kitchen to dining room:

1005_zps817f8017.jpg


1006_zps393df05c.jpg


Dinning to living room:

1002_zpsd71ddff5.jpg


1003_zpsb77dfbed.jpg


I am installing crown, base, shoe, new jambs, hanging new doors, window and door casings, plus turning the closet beside the cased opening into an AV componet built-in. 

Moving that dang floor duct:

1004_zps4a1a88e2.jpg
 
Very nice!!  Thanks for posting lots of pics of the build...also like the iron restoration in the photos!!

Scot
 
Back
Top