Crazyraceguy
Member
- Joined
- Oct 16, 2015
- Messages
- 4,887
The original post for this is some 7 or 8 pages back, from nearly a year and a half ago. It was one of the first parts of a pretty large, multi-phase job.
Well, the whole thing is done, and the place is open. One of the project managers went out and took some decent photos. They are not quite "lived in" yet, but somewhat fleshed out, not so stark as when the installers take pics.
I still don't have all of them, since the Email was apparently too large and some of them were left off. I didn't realize that until I got home to check them.
I will start with the firewood part, since it started all of this. It is way up high above an area I assume is a server station of some kind. It's in a huge, high ceiling room, yet the lower working area is somewhat screened. I made the screen frames and doors (but not the cabinets) along with the large column wraps.
Well, the whole thing is done, and the place is open. One of the project managers went out and took some decent photos. They are not quite "lived in" yet, but somewhat fleshed out, not so stark as when the installers take pics.
I still don't have all of them, since the Email was apparently too large and some of them were left off. I didn't realize that until I got home to check them.
I will start with the firewood part, since it started all of this. It is way up high above an area I assume is a server station of some kind. It's in a huge, high ceiling room, yet the lower working area is somewhat screened. I made the screen frames and doors (but not the cabinets) along with the large column wraps.