Mike Goetzke
Member
- Joined
- Jul 12, 2008
- Messages
- 1,134
It's 50F here in Chicago so time to get my wife's car out of my shop and mess around a bit. I recently bought the subject system and started getting familiar with it. I have seen on the videos the triangle being set up in a location such that the workpiece is registered off the triangle and the track is located to the table with a set of bench dogs.
I could swear I saw a pic or video of someone that put the longer pins in the triangle and fixed it to the rail with a set of rail clips. Anyone else remember this? What are the advantages of this?
Any experienced user hints/tricks on how to take full advantage of this system appreciated.
Thanks
I could swear I saw a pic or video of someone that put the longer pins in the triangle and fixed it to the rail with a set of rail clips. Anyone else remember this? What are the advantages of this?
Any experienced user hints/tricks on how to take full advantage of this system appreciated.
Thanks