jmbfestool
Member
- Joined
- Jan 9, 2009
- Messages
- 6,646
Sorry galwaydude18!
I read the topic and was going to reply later and tottally forgot!
Building is up! Just waiting for steel work for one part of the roof and structural loads calculations for oak trusses so I can start making the oak trusses.
Ill post pictures in abit.
The three phase is still on going! Just going with the flow with that one.
As far as jcb we have come to an agreement about the boundary.
Jmb
I read the topic and was going to reply later and tottally forgot!
Building is up! Just waiting for steel work for one part of the roof and structural loads calculations for oak trusses so I can start making the oak trusses.
Ill post pictures in abit.
The three phase is still on going! Just going with the flow with that one.
As far as jcb we have come to an agreement about the boundary.
Jmb